A Frame Brewing (Construction Continues) – Squamish

In late April I stopped into A Frame Brewing to check out their construction progress. Now I stopped in mid June and things are coming along. The basic framing of all of the walls is now done and they are just waiting for the last of the permits to start pouring concrete and drywalling.

The first 5 photos are different views of the tasting room and the 6th photo is the brewing space.  Hopefully all of their permits land asap and they can start really moving forward with the build out of the brewery.

A Frame Brewing
http://www.aframebrewing.com/
info@aframebrewing.com
38927 Queens Way
Squamish

2 comments on “A Frame Brewing (Construction Continues) – Squamish

  1. Allan Haley says:

    Can’t wait

    Al

    >

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s